PROPOSAL TO UPGRADE VODAFONE MOBILE PHONE BASE STATION (INCLUDING 5G) AT: MATTEL BUILDING - 658 CHURCH STREET, CREMORNE - RFNSA SITE NO. 3121006
1. The proposed facility consists of the addition of new Optus and Vodafone equipment and associated works as follows (including 5G):
• Removal of existing antenna mounts
• Removal of three (3) existing panel antennas
• Removal of six (6) existing remote radio units
• Installation of new antenna and remote radio unit mounts
• Installation of three (3) panel antennas (no more than 2.7m long)
• Installation of three (3) active antenna units (no more than 0.8m long)
• Installation of twelve (12) remote radio units
• Installation of one (1) GPS
• Future provision for active antenna units and remote radio units
• The removal and installation of ancillary equipment including but not limited to new mounts, combiners, filters, fibre cables, mhas, switches, feeder cables, breakout boxes, and electrical cabling, and reconfiguration of existing equipment on the mounting steelwork and in the existing equipment shelter.
2. Optus & Vodafone regards the proposed installation as aLow-impact Facility under the Telecommunications (Low-impact Facilities) Determination 2018 (“The Determination”) based on the description above.
3. In accordance with Section 7 of C564:2020 Mobile Phone Base Station Deployment Code, we invite you to provide feedback about the proposal. Further information and/or comments should be directed to: communityconsultation@ventia.com or Level 1,South Tower, 10 Browning Street, West End QLD 4101 Australia by COB Friday, 29 November 2024.
Cremorne 3121